Pilot Plant · Line 1 · Executive Factory
The first page a manager opens: good units per day, equipment effectiveness, the sustainable production target, cost per good unit, energy and water per unit, fleet health and quality, with verified savings kept apart from expected ones.
Pilot Plant · Line 1 · Machine Profile · M2
Every machine has its own profile: identity, the capacity ladder from design down to sustainable, remaining useful life, a 30-day health history and live signals against their learned bands.
Pilot Plant · Line 1 · Predictive Maintenance
Each alert explains itself: what is wrong, why, what could happen, when to act, the recommended action and how confident the model is. Approved alerts become work orders.
Pilot Plant · Line 1 · Energy & Utilities
Energy and water per good unit, broken down by machine and utility, so the consumer using more for the same output stands out.
Pilot Plant · Line 1 · AI Optimization · What-if
Move machine speeds and product mix and see output, margin, energy and the bottleneck before anything changes on the floor. The optimizer proposes the best sustainable point.
Screenshots from our working pilot platform, running on a simulated production line.